

Kohima: The Chakhesang Students’ Union (CSU) has issued a seven-day ultimatum to the National Highways and Infrastructure Development Corporation Limited (NHIDCL), expressing strong condemnation over the deteriorating condition of the Kohima–Jessami Road (Package 2) and alleged negligence by both NHIDCL and EPC contractor M/s Ratna Infrastructure Project Pvt. Ltd. In a letter addressed to the […]
The post Chakhesang students issue 7-day ultimatum over Kohima–Jessami road appeared first on EastMojo.